Nail in the center of the nailing slots.
Siding drip edge installation.
The common practice of installing drip edge tightly to the fascia creates a path for water to cling to the fascia and run down it wearing the face of the fascia and shortening its lifespan.
Nw walker mi 49544 888 784 0878.
Using drip edge with a nailing edge approx.
And not very durable.
Quality edge headquarters 2712 walkent dr.
How to install a drip edge slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Quality edge texas 634 107th street arlington tx 76011 888 784 0878.
The extension of flashing supports the edge of shingles.
The back leg was only an inch and drip leg was just a square 90 degree 1 4 in.
To seal the edge of a siding panel where it has been cut and to secure it to the wall you can use under sill trim.
If it doesn t pull the drip edge out slightly from under the shingles.
Make sure the outer edge extends over the gutter.
Video of the day.
If eaves troughs rain gutters are used the flashing edge also helps to direct the water into troughs.
Behind the faucet mounting plate install 1 2 in.
Quality edge texas 634 107th street arlington tx 76011 888 784 0878.
When installing the starter strips allow a 1 8 inch space for corner posts and j channels for expansion.
Then notch the siding from the top and slide it under the faucet.
Keep ends of adjoining starter strips at least 1 4 inch apart to allow for expansion.
Plywood in place of insulation board.
Above the bottom of the wall sheathing as a guide.
This stock drip cap has a short backleg minimal drip leg and is often made from metal too thin to meet code standards.
Typical installation aligns the bottom edge of the first row of siding 2 to 4 inches below the wall s bottom sill plate and over a continuous layer of waterproof kraft paper or polyethylene plastic sheeting.
Drop barely large enough to keep wind driven water from getting behind the siding.
Preformed eaves flashing drip edge should be installed under the starter course of the shingle roofing.
These strips installed at the bottom will make your first row of siding angle out to match the rest of the rows.
Snap a line 1 in.
If the faucet falls in the center of the.
Step 1 complete the installation of the first horizontal row of t1 11 siding following standard construction practices.
Create a drip edge find your most beat up pieces of siding and rip them down into 1 1 4 in.